Kitchen renovation electrician in Auckland, fixed price and fully certified

Electrical for your kitchen renovation, wired right the first time and booked in before the plasterer arrives. From $4,000 + GST ($4,600 incl. GST) for a standard single-storey kitchen with the linings stripped back to framing.

Get a fixed quote
Callback booked
Thanks, we'll ring you back on the day you picked. Keep an eye out for a call from 09 390 7966.
That didn't send. Try refreshing the page, or just call 09 390 7966.
Since 2013
Trading from Kumeū
Fixed
Itemised quote before work starts
Insured
Certificate of Compliance on every job
4.9
From 193 Google reviews

Kitchen renovation electrical from Livewire Electrical starts from $4,000 + GST ($4,600 incl. GST) for a standard single-storey kitchen in Auckland with the linings already removed. The package covers disconnection, prewire, fit-off, testing and certification, including dedicated hob and oven circuits, power points, LED downlights and rangehood ducting.

How it works

How a kitchen renovation runs

How a Livewire job runs, from the first call to the paperwork.

1

Send plans or photos

Cabinet layout, appliance models and where the island sits. You get a fixed, itemised quote with the upgrades you want priced in.

2

Prewire

Booked to land after demolition and before the linings go on. Typically 1 to 2 days.

3

Fit-off

After cabinets, benchtops, tiles and paint. Typically half a day to 1 day.

4

Liven, test, certify

We energise it, test every circuit and hand over the compliance paperwork.

What's included

What a kitchen renovation needs from an electrician

A kitchen renovation needs an electrician twice: before the walls close, and again after the cabinets go in, with testing and sign-off at the end. Miss the first visit and you are cutting into finished plaster later. Livewire does both visits and the sign-off for a standard kitchen as one package, so your builder, cabinet maker and tiler are never waiting on a sparky.

Dedicated hob and oven circuits from the switchboard

4 double bench power points and 5 cabinet power points

5 LED downlights, supplied and installed

Ducted rangehood above a cooktop with LED strip lighting under the cabinetry
Finished kitchen wired by Livewire, with a canopy rangehood, pendant light, wall oven and under-bench lighting
Why Livewire

Why Livewire for your kitchen renovation

Registered electricians based in Kumeū, trading since 2013, rated 4.9 on Google. Lead electrician licence E262038.

Fixed and itemised

Your builder can see exactly what is in the price and what is not.

Booked around your builder

Prewire lands before the linings go on, fit-off after paint.

Certified and tested

Every circuit is tested and you get the compliance paperwork for your records.

What customers say

4.9 from 193 Google reviews

Bathroom fan replacement. On time and did the job.
Susie Poon initial
Susie Poon
Read the review
Fantastic team! Our request was answered promptly and professionally. The electrician sent to our home, Tom, was efficient, friendly and great communicator. I also appreciated the tidiness at the work site after finishing and during the work. We are satisfied with the work carried out- moving and installing tricky PowerPoints in a kitchen and tiled bathroom. I will definitely be using this team again.
Mathilde richer de forges initial
Mathilde richer de forges
Read the review
Excellent service from Pete and Jared, who provided prompt, efficient service and initiated the task immediately (lighting update). 100% recommend their services :)
Prachi Desai initial
Prachi Desai
Read the review
Epic service from the Livewire Electrical team! We had an urgent breaker issue on a switchboard, logged the job at short notice and they had it attended to and sorted within 2 hours. Fast, professional and easy to deal with from start to finish. Really appreciate the quick turnaround when we needed it. Highly recommend the Livewire team!
Jamie Pohl initial
Jamie Pohl
Read the review
Jared and Tom were very friendly and efficient. Their workmanship was excellent. They were prompt on arrival, tidy with tools and equipment. They then tested the work they had done and did not leave the property until they, and myself, were satisfied that the job was to a high standard and working perfectly.
Suzanne Smith initial
Suzanne Smith
Read the review
Great service for lighting upgrade in the office. From the first point of contact I found the staff efficient, and clearly explained all options. The electrician that attended was professional, friendly, worked quickly and left no mess at all. Very satified with the job, will definately use again.
Abbie Baird initial
Abbie Baird
Read the review
I would highly recommend AJ at Livewire electrical. Friendly, reliable and fast service.
Nicolette Andrews-Mabille initial
Nicolette Andrews-Mabille
Read the review
These guys go above and beyond! Really good communication around a tricky job and job well done too. Highly recommend!
Kay McFarlane initial
Kay McFarlane
Read the review
I used livewire electrical a few years ago to update my circuit board it was done on the day as planned and a electrical certificate provided.This time I needed power to a new septic system the boys turned up on time were really great to deal with and once again the electrical compliance certificate sent through, I support local business and these guys are great.
Graeme McKenzie initial
Graeme McKenzie
Read the review
Absolutely A+ was my experience with Annette and the team. Had house electrical issues, Vector kept telling us it was our issue to sort...Livewire listened and diagnosed over the phone, pointed us back to Vector to sort it. Saved us a call out and no charge for advice. Awesome service and will be our first port of call next time. Thanks again
Justin Collins initial
Justin Collins
Read the review
Thank you livewire electrical. The office team were chipper and helpful on the phone. Appointment was set to suit my schedule. Tom, the sparky, was prompt. He did a great job to fix all our problems. He was polite, cheerful and fixed everything in no time. Pricing is very reasonable. I'd like to give bonus points from the dog to Tom. She appreciated to be able to spectate your work 😁
Grace Compton initial
Grace Compton
Read the review
Amazing team to work with from start to finish. 5 stars+
Catherine Stewart initial
Catherine Stewart
Read the review

FAQs

Got questions? We've answered the most common ones here.

Which parts of Auckland does Livewire do kitchen electrical in?

Livewire is based in Kumeū and works across North West Auckland (Kumeū, Huapai, Riverhead, Waimauku, Whenuapai, Hobsonville), West Auckland (Henderson, Te Atatū), the North Shore (Birkenhead, Takapuna, Northcote Point, Orewa, Whangaparaoa) and central Auckland (Parnell, Remuera, Epsom, Ponsonby, Mount Eden and surrounds).

What should I ask an electrician before hiring them for a kitchen renovation?

Ask for their registration or licence number, an itemised fixed quote, a list of exclusions, the certification you will receive, how they fit around your builder's schedule, and any workmanship warranty. A good electrician answers all six without hesitation. Livewire provides each in writing.

What warranty does Livewire give on kitchen electrical work?

Livewire gives a lifetime workmanship warranty on its electrical work. Appliances and fittings you supply carry the manufacturer's warranty.

What is the difference between a Certificate of Compliance and an Electrical Safety Certificate?

A Certificate of Compliance covers the lawfulness and safety of prescribed electrical work as it is done, and an Electrical Safety Certificate confirms an installation or part of one is electrically safe once it is connected to supply. A kitchen renovation can involve both. Livewire issues the compliance paperwork after the circuits are energised and tested.

Is my switchboard good enough for a new kitchen?

Not always, especially in older Auckland villas and bungalows. A new kitchen adds dedicated circuits for the hob and oven, and an old board may lack spare capacity or modern shock protection. A licensed electrician checks the board at the quote stage. If it needs upgrading, doing it during the renovation is cheaper than doing it separately later. Livewire's renovation packages assume the existing board has capacity, so an upgrade is quoted separately.

Can my builder or I do the kitchen electrical work?

Generally no. Most fixed wiring in a kitchen is prescribed electrical work that must be done by a licensed electrical worker, and a builder, cabinet maker or plumber is not licensed to do it. Homeowners may do only limited work under strict conditions, and landlords cannot do fixed wiring in a rental at all. See WorkSafe's guidance on getting electrical work done.

What paperwork does an electrician give you after a kitchen renovation?

A licensed electrician issues the electrical compliance paperwork for the work, which in NZ means a Certificate of Compliance for prescribed electrical work and an Electrical Safety Certificate when the work is connected to supply. Keep it with your house records. Insurers, buyers' lawyers and your builder may ask for it later.

Can I have smart or app-controlled kitchen lighting?

Yes, but smart switches and dimmers can need extra cabling at the switch, so decide at prewire stage, not after the walls are lined. Livewire also installs smart home systems. Tell the electrician which system you want when you request the quote.

Are downlights a fire risk in a ceiling with insulation?

Modern LED downlights run much cooler than old halogens, but ceiling insulation still has to keep the clearance the fitting's instructions require. A licensed electrician installs downlights to the fitting's rating and checks the insulation around them. Ask which downlight model is being used and what its insulation rating is.

Can kitchen downlights be dimmable?

Yes, if the LED downlights and the dimmer are a compatible pair. Livewire's standard package includes a standard 1 gang switch, so ask for a dimmer to be priced at the quote stage. Decide before fit-off so the right fittings are ordered.

What colour temperature should kitchen downlights be?

Two common choices are 3000K (warm white) for a homely feel and 4000K (neutral white) for crisp task lighting. Many kitchens use warm white downlights and cooler under-cabinet strips over the work area. Order every light in the room in the same colour temperature, because a mix looks patchy.

What is an RCBO, and why does a kitchen use several?

An RCBO is a circuit breaker with built-in shock protection for a single circuit. Using separate RCBOs for lighting and power points means a fault trips only that circuit, so one tripped appliance does not black out the whole kitchen. Modern installations use RCD protection on most household circuits.

Can I add under-cabinet, toe kick or island lighting later?

It is far easier and cheaper before the cabinets and benchtops go in. Cabling for LED strips, island power and pendants is hidden inside the framing and cabinetry at prewire stage. Adding it afterwards usually means visible cable runs or opening finished walls.

How many downlights does a kitchen need?

It depends on the room size, ceiling height and benchtop layout, not a fixed number. The aim is even light over every work surface without shadows from your own body. Livewire's package includes five LED downlights on one switch, and under-cabinet LED strip lighting is the usual addition for task lighting.

How many power points does a kitchen need?

There is no single right number: it depends on how you use the kitchen. Plan one at every spot where an appliance sits on the bench, plus dedicated outlets for the fridge, dishwasher, microwave and rangehood. Livewire's package includes four double points above the bench and five single cabinet points, and an island adds more.

Can I add an instant boiling water tap or waste disposal unit?

Yes, but each needs a power point under the sink, planned before the cabinets go in. Tell the electrician at the quote stage so the outlet lands in the right cabinet and sits out of reach of water. Adding it later usually means drilling through finished cabinetry.

Do the dishwasher and microwave need their own power points?

Yes, each appliance should have its own accessible outlet, normally in the cabinet beside or above it. Livewire's package includes five single cabinet power points on the existing power circuit with RCBO protection, so decide which appliances get them at the quote stage. High-draw extras such as a boiling water tap or a large steam oven can need more, so list them at the quote stage.

Where should the fridge power point go?

Put it in the adjacent cabinet or a position beside the fridge space where the plug stays reachable. A point hidden behind the fridge cannot be switched off without pulling the fridge out. Livewire's package includes five single cabinet power points, so decide which appliances get them before the cabinets go in.

Does a double oven, steam oven or combi oven need different wiring?

Larger and multi-function ovens can draw more power than a single wall oven, so they may need a heavier circuit. Check the manufacturer's installation manual and send the model to the electrician before prewire. The standard 20 A oven feed suits a typical single wall oven.

Can the oven and hob share one circuit?

Livewire's standard is a separate circuit for each: a dedicated 32 A feed for the hob and a dedicated 20 A feed for the oven. Each has its own breaker at the switchboard and its own isolator. Giving each appliance its own circuit means a fault on one leaves the other running.

What size cable and breaker does an electric hob need?

It depends on the hob's rating and the cable run, and the manufacturer's installation manual sets the requirement. Livewire's standard hob feed is a dedicated 32 A circuit with a 15 m cable allowance. A high-output induction hob needs a heavier circuit, which Livewire prices as an upgrade.

What electrical changes are needed to switch from a gas hob to induction?

Switching from gas to induction needs a new dedicated circuit from the switchboard, a hob isolator, and a switchboard with spare capacity. Induction hobs draw far more current than any other kitchen appliance. A 900 mm, 9.2 kW induction cooktop draws about 40 A, so it needs a heavier circuit than a standard 32 A hob feed. Give the electrician the hob model at the quote stage.

Does a rangehood need ducting, and should it vent outside?

A ducted rangehood moves moisture, grease and cooking smells outside, and in most renovations ducted is the better choice. The package includes 150 mm ducting from the rangehood to the soffit (6 m allowance), run while the ceiling is open. A recirculating rangehood needs no duct but only filters the air, so moisture stays in the house.

Can I supply my own hob, oven and rangehood?

Yes. Livewire's package is built around customer-supplied appliances, which the electrician connects. Send the model numbers before prewire so the cut-outs, isolator positions and cable routes match the appliances you actually bought.

Does an induction cooktop need its own circuit?

Yes, an induction cooktop needs a dedicated circuit, and a large one may need a heavier circuit than a standard hob. A 900 mm, 9.2 kW induction cooktop draws roughly 40 A, so it needs a heavier cable and breaker than a 32 A hob feed. Check the manufacturer's installation manual before the cable goes in, and tell your electrician the model at quote stage. Livewire prices this as a dedicated 9.2 kW circuit with an isolating switch.

Do I need an electrician to install a hob or wall oven in NZ?

Yes, for hard-wired appliances. Hobs and wall ovens normally connect to their own circuit from the switchboard, and fixed wiring is prescribed electrical work that only a licensed electrician can do. A plug-in appliance that needs no new wiring is different, but most built-in hobs and ovens are not.

Does a kitchen company or builder include the electrician?

Often not. Many kitchen suppliers and builders supply and install the cabinets only, and the electrician is booked separately. Ask in writing who is responsible for the prewire, the fit-off and the appliance connections, so none of the three falls between trades. Livewire schedules around your builder's programme.

What happens if the electrician finds a problem when the walls are open?

The electrician tells you what was found, explains the options and quotes any extra work before doing it. Opening walls sometimes shows damaged cable, poor joints or overloaded circuits. Anything unsafe has to be fixed before the work can be certified.

Does a kitchen renovation mean rewiring the whole house?

No. A kitchen renovation involves the kitchen circuits only. If the electrician finds that the rest of the house has unsafe or very old wiring, they will tell you and quote that separately, but the kitchen package does not depend on a rewire.

Can I keep my existing wiring in a kitchen renovation?

Sometimes. Livewire's package connects your new power points and downlights to the existing power and lighting circuits, and runs new dedicated circuits for the hob and oven. The electrician checks the condition and capacity of the existing wiring at the quote stage, and old or damaged cable is replaced where it is found.

How far ahead should I book an electrician for a kitchen renovation?

Book as soon as the cabinet layout and appliance models are settled, and before demolition finishes. Prewire has to fit into the narrow gap between demolition and lining, and a missed slot can hold up the plasterer and every trade after. Send plans and appliance models with the enquiry so the quote is accurate.

Does the electrician come before or after the plasterer?

The electrician comes before the plasterer for prewire and after the painter for fit-off. Once the linings are on, new cables mean cutting into finished walls. Book the electrician as soon as the kitchen layout is fixed.

What is the difference between prewire and fit-off?

Prewire is running the cables while the walls and ceiling are open, and fit-off is installing the switches, power points, lights and appliances once the finishes are done. They are two visits because the cables must be in before the linings go on, and the fittings cannot go on until the cabinets, tiles and paint are finished. Livewire typically needs 1 to 2 days for prewire and half a day to 1 day for fit-off.

What electrical work does a kitchen renovation need?

A kitchen renovation typically needs dedicated circuits for the hob and oven, power points above the bench and in the cabinets, lighting, a rangehood connection and duct, and certification of the finished work. New circuits and outlets are added while the walls are open (prewire), then switches, lights and appliances are connected after the finishes are done (fit-off). Livewire's standard package covers all of it for a single-storey kitchen.

Can the electrician still wire my kitchen if the walls are already closed in?

Yes, but it costs more and is messier. The electrician has to cut access holes, run cable through the framing and leave the plasterer to patch, which is why the from-price assumes the linings are already off. If your walls are still open, book your electrician now.

What should I decide before the electrician starts prewire?

Decide the cabinet layout, the exact make and model of the hob, oven and rangehood, where the island sits, where you want power points and switches, and where the downlights should land. These choices fix where cables go, and moving them after the linings are on means cutting into finished walls. Giving the electrician your cabinet plans and appliance installation manuals up front prevents most of the rework.

How long does kitchen electrical work take?

Prewire typically takes one to two days and fit-off half a day to one day for a standard kitchen. Prewire is the more time-consuming visit because every cable run has to be pulled while the framing is open. A clear, stripped-back kitchen is the fastest to wire.

When does the electrician come during a kitchen renovation?

An electrician comes twice: once for prewire and once for fit-off. Prewire happens after demolition and before wall and ceiling linings go on, while the framing is open. Fit-off happens after cabinets, benchtops, splashback tiles and paint, when power points, switches, downlights and appliances are installed and the system is energised and tested.

How do I compare electrician quotes for a kitchen renovation?

Compare the scope line by line, not the total. Check the number of power points and downlights, the circuits for the hob and oven, the rangehood duct, who supplies each fitting, whether the switchboard is covered, and what paperwork and warranty you receive. A cheaper quote often leaves out the duct, the isolators or the certification.

Why does kitchen electrical cost more once the kitchen is finished?

It costs more because walls, cabinets and tiles must be opened and repaired to run cable. Doing the electrical during the renovation means cables go through open framing with no patching or repainting afterwards. Features such as island power and under-cabinet lighting are the usual regrets when skipped at prewire.

Are kitchen electrical prices in NZ quoted with or without GST?

Many NZ electricians quote without GST, so always ask. Livewire's kitchen package is $4,000 + GST, which is $4,600 including 15% GST. The quote is fixed and itemised, so the figure you approve is the figure you pay unless you change the scope.

What can push a kitchen electrical quote above the starting price?

The main factors are cable runs longer than the 15 m allowance for the hob and oven feeds, a rangehood duct longer than 6 m, a second storey or poor ceiling access, and upgrades such as an induction circuit, island power or LED strip lighting. Linings that are already back on also add cost because the walls must be opened to run cable. The package assumes the existing switchboard has capacity for the new circuits, so a switchboard upgrade is outside it and quoted separately. Livewire itemises each of these in a fixed quote before work starts.

What is included in the from-$4,000 + GST kitchen package?

The package covers disconnection of the old kitchen, prewiring, fit-off and certification. That means dedicated hob and oven feeds from the switchboard, four double power points above the bench, five single cabinet power points, five LED downlights with their own switch and RCBO, a 150 mm rangehood duct to the soffit, and connection of your supplied hob, oven and rangehood. Every circuit is energised, tested and certified.

How much does an electrician cost for a kitchen renovation in NZ?

Kitchen renovation electrical from Livewire Electrical starts from $4,000 + GST ($4,600 incl. GST) for a standard single-storey kitchen with the linings already removed. The final figure depends on the number of circuits, appliance types, cable run lengths, lighting design and the condition of the switchboard.

Get a fixed quote

Tell us about the job. You get an itemised price before any work starts, and we reply within one business day.