A commercial lighting upgrade in Auckland replaces fluorescent and high-wattage fittings with LED matched to the space: high-bay for warehouses, panels for offices, high colour-rendering fittings for retail. Livewire Electrical scopes fixture count, circuit capacity and lux levels first, stages the work area by area so the business keeps running, and hands over a Certificate of Compliance and emergency lighting records.
How a lighting upgrade runs
Staged around your business, Monday to Friday.
Scope the space
Fixture count, circuits, energy use and how each area is used.
Design and quote
Fittings matched to each task and a fixed quote before work starts.
Staged install
Zone by zone, so staff and customers are not working around ladders for long.
Test and hand over
Emergency fittings tested and records handed over with the Certificate of Compliance.
Where the savings come from
Fluorescent, metal halide and high-wattage fittings burn power and burn out. LED cuts consumption for the same light and removes the ongoing cost of tubes, ballasts and access equipment.
Installed in stages so the business keeps running
Emergency lighting tested and documented


Why Livewire for commercial lighting
Levi's at Westfield Albany and Skechers at Manawa Bay were both handed over on time.
Not a like-for-like swap
Light is matched to the task, so the upgrade is noticed for the right reasons.
Business keeps running
Work is staged area by area and planned with you.
Compliance included
Emergency lighting is tested and documented as part of the job.
4.9 from 187 Google reviews
FAQs
Got questions? We've answered the most common ones here.
Which lighting solutions suit different commercial spaces?
Warehouses and factories need high-bay LED rated for height and for dust or moisture. Cold storage needs fittings rated for low temperature. Retail benefits from higher colour-rendering fittings that make product look accurate. Offices are increasingly using human-centric lighting that shifts colour temperature through the day. Matching the fitting to the space's actual conditions affects lifespan as much as it affects light quality.
What compliance standards apply to commercial lighting in NZ?
Commercial lighting has to meet emergency lighting requirements for exit paths on top of general electrical safety standards, and larger renovations usually need building consent alongside electrical certification. What applies depends on the building's class and use, which is why a licensed electrician should confirm requirements before design work starts, not after.
How much can a business save by upgrading commercial lighting?
Businesses switching from older fluorescent or high-wattage fittings to modern LED commercial lighting typically see a meaningful drop in electricity use, with payback speed depending on usage hours and how inefficient the current fittings are. Beyond the power bill, upgraded lighting tends to improve workplace comfort and cuts maintenance cost, because LED fittings need replacing far less often than fluorescent tubes.
What is involved in planning a commercial lighting upgrade project?
Planning starts with assessing what is already there: fixture count, circuit capacity and current energy use. Then light output (lux levels) is matched to how the space is actually used, not just replaced like for like. For occupied buildings the work is usually staged outside business hours so retail and office tenants are not dealing with electricians during trading time.
Related services
Explore other services we provide across Auckland.
Based in Kumeū, working across Auckland
Fastest response across Huapai, Riverhead, Waimauku, Whenuapai and Hobsonville. Auckland-wide for rewires, switchboards, EV chargers and commercial work.
Get a fixed quote
Tell us about the job. You get an itemised price before any work starts, and we reply within one business day.





